--
BadderMarzocchi - 2016-09-07
MCP: ECAL timing upgrade
This page is a documentation of the testbeams aiming to MCP testing, performed at CERN (H2/H4/T9) and at the BTF, since the 2014 till today
June2016 - T9
Main measurments:
- HV scans on MiB-25mu stack in Bicocca's camerone with 5 GeV pions.
- Timing long run on MiB-25mu stack in Bicocca's camerone with 5 GeV pions.
- HV scans on MiB-10mu stack in Bicocca's camerone with 5 GeV pions.
- Timing long run on MiB-10mu stack in Bicocca's camerone with 5 GeV pions.
- Long run on MiB-10mu @ 2GeV: e- ~20%.
- Long run on MiB-10mu @ 2GeV: e- ~20% with 3X0 lead absorber in front of MiB2.
- Long run on MiB-10mu @ 1GeV: e- ~80% with 3X0 lead absorber in front of MiB2.
- Long run on MiB-10mu @ 3.5GeV: e- ~10% with 3X0 lead absorber in front of MiB2.
- HV scan with Bicocca's Camerone at T9 with 5 GeV pions.
- Configuration inside the Camerone: 25mu (HVIN1), 10mu (HVIN2)
- Configuration on the beam line: Cerenkov - Scint1 (6x6 cm2) - MiB2 - Scint2 (1x1 cm2) - Camerone (~2m from XDWC) - RM2 - Scint3
- Stacks in camerone have been modified wrt BFT with 1k resistor on anode closing on ground inside the chamber to avoid reflections. MCP MID & MCP OUT in parallel between 25mu & 10mu with a resistor (100k?)
- Using digitiser MIB group 1:
ch0 -> MIB2
ch1 -> 25mu
ch2 -> 10mu
ch3 -> RM2
ch4 -> N/A
ch5 -> N/A
ch6 -> S3
ch7 -> CHERENKOV
- New configuration: Added another scintillator (2x2) readout on digitizer ch5 on the table ~10cm before the 1x1 scintillator). S1 back to 6x6,
ch0 -> MIB2
ch1 -> 25mu
ch2 -> 10mu
ch3 -> RM2
ch4 -> N/A
ch5 -> S4
ch6 -> S3
ch7 -> CHERENKOV
- HV SCAN MiB-25mu HVMID=1200V
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4585 3500 1200 1200 13k
4586 3600 1200 1200 10k
4587 3700 1200 1200 12k
4588 3400 1200 1200 10k
4589 3300 1200 1200 10k
4590 3200 1200 1200 10k
- HV SCAN on MiB-10mu - HVMID=1000V
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4562 1000 2600 1000 5K
4563 1000 2700 1000 5K
4564 1000 2800 1000 5K
- HV scan MiB-10mu HVMID=1200V
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4567 1200 2800 1200 10k
4568 1200 2900 1200 10k
4569 1200 3000 1200 13k
4570 1200 3100 1200 13k
4571 1200 3200 1200 10k
4572 1200 3300 1200 10k
4573 1200 3500 1200 10k (pressure stable @ 1.9E-5)
4574 1200 3600 1200 19k (pressure stable @ 1.9E-5)
4575 1200 3700 1200 13k (pressure stable @ 1.9E-5)
- Long run for TIMING on MiB-10mu
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4566 1200 3400 1200 178k
- Continuing HV scan MiB-10mu HVMID=1000V
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4576 1000 3500 1000 10k
4577 1000 3400 1000 13k
4578 1000 3300 1000 12k
4579 1000 3200 1000 16k
4580 1000 3100 1000 13k
4581 1000 3000 1000 13k
4582 1000 2900 1000 15k
- Moving to lower energy to have an electrons enriched beam:
- Long run @ 2GeV: e- ~20% of events
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4594 1200 3400 1200 190k
- Also preshower configuration: add 3X0 lead absorber in front of MiB2, add attenuation of factor x10 for 10mu:
- Long run @ 2GeV: e- ~20% of events Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4597 1200 3500 1200 307k
- Long run @ 1GeV: e- ~80% of events
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4598 1200 3500 1200 4.5k
4599 1200 3500 1200 16k
- Long run @ 3.5GeV: e- ~10% of events
Run HVIN1 (V) HVIN2 (V) HVMID (V) Events
4600 1200 3500 1200 80k