ATLAS Muon Phase 2 Resources Coordinator Page.
%ATLASLOGO% |
ATLAS Muon Spectrometer
Muon Upgrade Phase II
|
The ATLAS muon spectrometer is operated in a large background of neutrons and γ rays. In order to cope with background counting rates of up to 15 kHz/cm
2 the so-called ``small wheel'' will be replaced by a new small wheel (NSW) with chambers with increased high-rate capability in the long shutdown 2. The other muon spectrometer upgrades will be carried out in long shutdown 3. In the NSW small strip TGCs (sTGCs) will be used for triggering while
MicroMegas will be used for precision tracking and a refined muon momentum measurement at trigger level. The big wheel's TGCs closest to the beam pipe will be replaced with TGCs with higher spatial resolution to increase the selectivity of the 1
st level muon trigger. New thin-gap RPCs will be added to the inner barrel layer to close acceptance gaps of the barrel muon trigger. To free space for the RPCs MDT chambers will need to be replaced by so-called ``sMDT chambers'' which are drift-tube chambers with 15 mm diameter tubes instead of 30 mm diameter tubes. In order to identify muons within the whole acceptance of the upgraded inner detector of |ηl<4.0 a muon tagger will be added close to the beam pipe between the forward calorimeter and the shielding disk of the NSW. Finally the new trigger architechture will require new on- and off-chamber electronics.
Introduction
Documentation
Major Procurements Via CERN
ASD, additional 25 wafers |
5.2.1.1 |
25/06/2020 |
https://edh.cern.ch/Document/SupplyChain/DAI/8319957 |
MPI |
48,579 |
$51,200 |
MPI, 100 |
Completed |
T525201 |
ASD non recurring costs (masks) |
5.2.1.1 |
25/06/2020 |
|
MPI, Mainz(BMBF) |
345,100 |
|
MPI, 38, Mainz(BMBF) 62 |
Completed |
|
Connectors for flat cables |
5.2.3.1 |
01/07/2020 |
https://edh.cern.ch/Document/SupplyChain/DAI/8328956 |
Mainz(BMBF) |
20,381 |
€19,162 |
Mainz(BMBF), 100 |
Completed |
T525203 |
Flat halogen-free cable |
5.2.4.5 |
11/10/2019 |
https://edh.cern.ch/Document/SupplyChain/DAI/7990427 |
Hong Kong |
175,546 |
159,660 |
Hong Kong, 100 |
Completed |
T525100 |
Gas-Gaps |
5.3.1 |
closing on Aug.3 2021 |
https://cds.cern.ch/record/2774725 |
|
|
1.400,000 |
INFN, 50, MPI, 50 |
Market Survey MS-4684/EP/ATLAS will be closed on Aug, 03 2021; ongoing discussions with MPI; small fraction procured not via CERN? |
|
first batch of Backelite (25%) |
5.3.1 |
|
|
|
|
60,000 |
INFN, 50, MPI, 50 |
Being discussed. DAI in ~September? |
|
FR4 raw foils for BIL RO planes |
5.3.3.4 |
|
https://cds.cern.ch/record/2791167 |
|
|
200, 000 |
INFN, 72, JINR, 28 |
DO-33060/EP/ATLAS, dead-line Jan.10th 2022 |
|
Photo incision of raw FR4 foils |
5.3.3.4 |
|
https://edh.cern.ch/Document/SupplyChain/DepartmentRequest/9011953 |
|
|
200,000 |
INFN, 72, JINR, 28 |
Departmental Request |
|
glue for RO planes |
5.3.3.4 |
|
|
|
|
~20,000 |
INFN, 72, JINR, 28 |
Options being discussed |
|
Nomex for RO planes |
5.3.3.4 |
|
|
|
|
~50,000 |
INFN, 72, JINR, 28 |
Nothing done |
|
Power System |
5.8 |
closed 23 Feb.2021 |
https://cds.cern.ch/record/2750391 |
|
|
7076 |
Various |
Market Survey MS-4661/EP/ATLAS completed, preparing the IT; discussion on how open the tender has to be (<end year?) |
|
RPCPrototypes
--
BaroncelliToni - 2021-06-24