SCT Calibration Procedure

The SCT calibration should be performed in the steps listed below.

Status of what is uploaded to the calibration database canbe checked here: http://pc-sct-www01.cern.ch/tests/calibstatus/calibstatus.php .

  1. For each crate:
    1. 2DBoc, RXThreshold, Pipeline, Fullbypass => save configuration
    2. MSR => save configuration
    3. Any module where the tests can not be finished should be put into the module history.
  2. Try a Strobedelay followed by 3Pt Gain. If one crashes, exclude modules and perform a calibration such that it completes up to the end => excluded modules in module history.
  3. Trimming where necessary => failed modules in module history
  4. Strobedelay followed by responce curve with the modules that are good (as verified by 3 Pt Gain). If modules have to be taken out for the test, document it in the module history. -> save configuration
  5. When all other tests are done, do noise occupancy scan and a synchdoubletrigger noise.

-- IngoTorchiani - 2009-08-21

Edit | Attach | Watch | Print version | History: r5 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2009-08-21 - unknown
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Sandbox All webs login

  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2021 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback