Introduction
Here below is a compilation of the data acquired during the 2014 testbeam at Fermilab. The data collected from both the sTGC module-1 as well as from the 40x60 are included.
Important Notes
- The IP addresses and the Dead/Noisy cell maps apply to the specific run number where it is stipulated and for the following runs until it is otherwise stated.
- IP X means IP 10.0.0.X
- If not specified:
- VMM thresholds set to 270
- Gain = 3.0
- Neighbors = on
- High Voltage set to 2.9kV in all four layers
Data
Run Number |
Files |
Total Number of Events (estimated) |
Table Position [mm] |
Dead/Noisy Cells |
VMM Configuration |
DAQ |
Date |
Notes |
38 |
|
~10000 |
x=1952.5 |
y=465.2 |
--- |
IP's: 21, 19, 25, 18, 270 thresholds on all VMMs |
Hits not synchronized |
15/05/2014 |
--- |
39 |
|
~20000 |
x=2157 |
y=464.9 |
--- |
--- |
Hits not synchronized |
16/05/2014 |
--- |
40 |
|
~20000 |
x=2574.5 |
y=465.3 |
--- |
--- |
Hits not synchronized |
16/05/2014 |
--- |
44 |
|
~20000 |
x=2571.5 |
y=442.2 |
Channel 20 layer 4 dead |
--- |
Hits not synchronized |
16/05/2014 |
--- |
45 |
|
~20000 |
x=1943 |
y=442.2 |
--- |
--- |
Hits not synchronized |
16/05/2014 |
--- |
46 |
|
~20000 |
x=2355.5 |
y=442.0 |
--- |
--- |
Hits not synchronized |
16/05/2014 |
--- |
59 |
|
~20000 |
x=2357 |
y=442.2 |
--- |
--- |
Hits not synchronized |
16/05/2014 |
HV set to 2.95 kV in layer 1 and 2 |
62 |
|
~20000 |
x=2574 |
y=442.2 |
Channels 47 to 63 masked in IP 22 (L3S3) |
280 threshold in IP 22, 270 in all others |
Hits not synchronized |
16/05/2014 |
--- |
65 |
|
~20000 |
x=2574 |
y=415.3 |
--- |
--- |
Hits synched |
16/05/2014 |
Check multiplicity in layer 1 |
67 |
|
~20000 |
x=2355 |
y=395.5 |
--- |
--- |
Hits synched |
16/05/2014 |
--- |
68 |
|
~20000 |
x=2575 |
y=395.5 |
--- |
--- |
Hits synched |
16/05/2014 |
--- |
77 |
|
~20000 |
x=1933 |
y=395.5 |
--- |
--- |
Hits synched |
16/05/2014 |
--- |
81 |
|
~22000 |
x=1923 |
y=465.4 |
--- |
--- |
Hits synched |
17/05/2014 |
--- |
--
MerlinDavies - 05 Jun 2014