Station

Chamber or half chamber (date)

Status

Notes
  • Chamber controlled in the pit or the ACR.
  • A LV or CROCUS is connected to another power supply that the one is it supposed to use.

LC2 status

  • List of the errors, with buspatches, detection elements and nature of the error.

Pedestal run status

  • Errors encountered.
  • Changes made in the configuration to remove the parity errors.
  • Snapshots of the run (both pedestal and noise) Comments of the snapshots (which problems are expected and which are not and must be checked).

Standalone Run

  • Same as the pedestal run, with a snapshot of the Hit Map.

Status of the Gas

Status of the HV test

To do list

  • The list of everything that need to be done in the chamber.

-- MicheleFloris - 05 Aug 2008

Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r3 - 2020-08-20 - TWikiAdminUser
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Sandbox/SandboxArchive All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback