SLHC Tracker Upgrade UK Meetings

  • Area used for Meeting agendas/materila for SLHC Tracker Upgrade WP7 meetings

1 Meetings

1.1 Material for meeting on 22nd June

Preliminary Agenda; 2nd Draft

10.30am - Presentation for 2nd

  1. Outline of Presentation for 2nd
  2. Material from on-going work
  3. Discussion of presentation for 2nd

Lunch

  1. Reminder of programme in PPRP document & Funding situation
  2. Brief presentations/ statements from groups on work they wish to pursue
  3. Discussion of proposed areas of work – as relevant now?
  4. Division of labour
  5. Organisation, including financial

1.2 Talks for 2nd July

1.3 Talks for 27th July

1.4 Talks for 8th October 2007

Preliminary Agenda (10.30 coffee, 11.00 start)

  • Brief Intro Richard N.
    • Minutes of previous meeting
  • Project Status [ include 6 month plan where possible ]
    • Materials Tim
    • Materials Testing Richard B.
    • Materials choice Justin
    • Cooling Georg
    • Tapes Richard N.
    • Barrel end region Janet F.
    • Fault Analysis/Spallation Source Mike T. ?
    • Layout Studies Wing/Peter
  • Tube Wiggles Tim
  • Material Budget Marc
  • Budget Status Richard N.
  • Preparation for Valencia Phil et al.
  • AOB

WP7barrelend1007.ppt: Janet Fraser

Cable_and_connector_schedule.xls: Richard Nickerson c/c

Revised_Minutes_of_WP7_Meeting_27th_July.doc: Minutes of previous meeting

Materials_issues.ppt: Justin on Materials

AT0003_Initial_commentary_on_radiation.pdf Earlier document for reference

AU0009_materials_spec-JT.doc: INCOMPLETE DRAFT materials list/plan

6_month_RD_programme_on_cooling_pipes.pot: R&D programme on cooling pipes

SLHC_Module_Requirements.ppt: Phil's and Mike's presentations from the MIWG 1/10/07

1.5 Meeting of 3rd December 2007

Preliminary Agenda (10.00 coffee, 10.30 start, Room E7, UCL)

  • Brief Intro
  • Talks for Valencia
    • Modules Tim
    • Macro Mechanics Richard N
  • Project Status
    • Materials/PO Justin
    • Materials Testing Richard B
    • Modules - single sided design Peter
    • Thermal runaway Peter
    • Thermal Performance Estimates Graham
    • Cooling Georg
    • Tapes
    • Barrel end region Janet
    • Fault Analysis/Spallation Source
    • Layout Studies no update
  • Budget Status
  • AOB

2 Weekly Meetings

These meetings are weekly at 11am on Mondays. CERN conference calls - 00 41 22 767 7000

Work areas: Modules; Tapes; Cooling pipes; Mechanical Support; Services; Materials; Materials measurements

2.1 Meeting of 11th Feb 2008

  • Weekly Phone Meeting - conference call details
    • Date: Monday 11th February 2008, 11am, 00 41 22 767 7000
    • Name of meeting: ATLAS-UK WP7
    • Name of organiser: Richard Nickerson

  • 'agenda'
    • Status Statements
    • Statements from Valencia
    • Meeting on March 17th
    • Organisation
    • AOB

2.2 Meeting of 18th Feb 2008

  • Weekly Phone Meeting - conference call details
    • Date: Monday 18th February 2008, 11am, 00 41 22 767 7000
    • Name of meeting: ATLAS-UK WP7
    • Name of organiser: Richard Nickerson

  • Agenda
    • Lightening Summary of other meetings
    • spend profile
    • Cartigny Agenda/Attendance

2.3 Meeting of 25th Feb 2008

  • Weekly Phone Meeting - conference call details
    • Date: Monday 25th February 2008, 11am, 00 41 22 767 7000
    • Name of meeting: ATLAS-UK WP7
    • Name of organiser: Richard Nickerson

  • Agenda
    • Brief Summary of any other meetings
    • Extended Summary of Pipe Test Work
    • Cartigny Agenda/Attendance

2.4 Meeting of 3rd March 2008

  • Weekly Phone Meeting - conference call details
    • Details: 11am, 00 41 22 767 7000
    • Name of meeting: ATLAS-UK WP7
    • Name of organiser: Richard Nickerson

  • Agenda
    • Reports from Work Areas [ Materials; Modules; Cooling; Tapes; Layout ]
    • Report from WP meeting
    • Extended Summary of Materials Thermal Measurements (if ready)
    • Cartigny Follow up attendance (18th)

2.5 Meeting of 10th March 2008

  • Weekly Phone Meeting - conference call details
    • Details: 11am, 00 41 22 767 7000
    • Name of meeting: ATLAS-UK WP7
    • Name of organiser: Richard Nickerson

  • Agenda
    • Reports from Work Areas [ Materials; Modules; Cooling; Tapes; Layout ]
    • Report on Barrel End work
    • Outline Talk on 'UK Concept'

Topic attachments
I Attachment History Action Size Date Who Comment
PowerPointppt 01-12_Tube_Order_UCL_V1.ppt r1 manage 2065.0 K 2007-12-03 - 11:44 RichardNickerson tube order
PowerPointppt 07-11_ID_Layout__CER_UCL_V2.ppt r1 manage 4126.5 K 2007-12-03 - 11:45 RichardNickerson jason id layout
PowerPointpot 6_month_RD_programme_on_cooling_pipes.pot r1 manage 2834.0 K 2007-10-08 - 11:31 UnknownUser R&D programme on cooling pipes
PDFpdf AT0003_Initial_commentary_on_radiation.pdf r1 manage 2430.2 K 2007-04-12 - 16:46 UnknownUser Some information on Radiation in Materials
PDFpdf ATLAS_SLHC_Tracker_Application_Final.pdf r1 manage 1477.6 K 2007-06-22 - 07:18 RichardNickerson proposal - final
Microsoft Word filedoc ATLAS_SLHC_Tracker_Staff.doc r1 manage 198.5 K 2007-06-22 - 07:18 RichardNickerson staff
Microsoft Excel Spreadsheetxls ATLASupgrade060308.xls r1 manage 42.0 K 2008-03-07 - 13:14 RichardNickerson Barrel End spreadsheet
PowerPointppt ATLASupgradebarrelendv5.ppt r1 manage 391.5 K 2008-03-07 - 13:13 RichardNickerson Barrel End
Microsoft Word filedoc AU0009_materials_spec-JT.doc r1 manage 92.0 K 2007-10-07 - 19:21 JustinGreenhalgh INCOMPLETE DRAFT materials list/plan
PowerPointppt AU0020_Materials_issues_VLC.ppt r1 manage 16.5 K 2007-11-30 - 15:57 JustinGreenhalgh Justin draft talk on UK materials work to advertise outr presence at VLC
PowerPointppt AU0023_materials_PO_UCL.ppt r1 manage 14.5 K 2007-11-30 - 15:56 JustinGreenhalgh Justin report on CERN PO and UK materials work
PDFpdf Andy_cooling_wshopsept06.pdf r1 manage 1152.7 K 2007-03-27 - 15:01 UnknownUser Cooling Loop RAL
PDFpdf Andy_integrated_stave.pdf r1 manage 2162.0 K 2007-03-27 - 15:01 UnknownUser Integrated Stave RAL
PowerPointppt Barrel_end.ppt r1 manage 58.5 K 2007-05-23 - 17:41 UnknownUser Some thoughts about the humidity/thermal environment at barrel ends
Microsoft Word filedoc Brief_Notes_from_25th_Feb.doc r1 manage 24.5 K 2008-03-03 - 11:20 RichardNickerson Notes from Meeting of 25/2/2008
Microsoft Excel Spreadsheetxls Cable_and_connector_schedule.xls r1 manage 14.0 K 2007-10-05 - 15:09 RichardNickerson Richard Nickerson c/c
Microsoft Word filedoc CartignyProgram.doc r1 manage 78.5 K 2008-02-11 - 11:05 RichardNickerson  
Microsoft Word filedoc CartignyProgram_(4).doc r1 manage 86.5 K 2008-02-18 - 00:35 RichardNickerson possible Cartingy agenda
Microsoft Word filedoc CartignyProgram_R6.doc r1 manage 81.0 K 2008-02-25 - 02:33 RichardNickerson latest version
PowerPointppt Costs.ppt r1 manage 20.5 K 2007-06-22 - 07:17 RichardNickerson Costs Allocated
PowerPointppt MaterialsOxfordOct.ppt r1 manage 16.5 K 2007-10-08 - 12:17 UnknownUser Talk by Tim Jones
PowerPointppt Materials_issues.ppt r1 manage 1995.0 K 2007-10-07 - 19:20 JustinGreenhalgh Justin on Materials
PDFpdf Module_Integration_Summary_for_PO.pdf r1 manage 1738.6 K 2007-05-09 - 10:47 UnknownUser Module Intergration Summary Phil Allport
PowerPointppt Nickerson_2nd_july.ppt r1 manage 4420.0 K 2007-06-28 - 07:46 RichardNickerson draft talk for 2nd July
PowerPointppt Nickerson_Valencia_2007.ppt r2 r1 manage 2613.5 K 2007-12-03 - 11:16 RichardNickerson draft talk for valencia
Microsoft Word filedoc Notes_from_Meeting_of_18th_February.doc r1 manage 24.5 K 2008-02-18 - 19:05 RichardNickerson notes from meeting
PowerPointppt Outline__2nd_July_Meeting.ppt r1 manage 37.5 K 2007-06-21 - 14:45 RichardNickerson discussion talk 2nd
PDFpdf P.Sutcliffe_SLHC_engineering_28th_march2007.pdf r1 manage 1922.7 K 2007-03-27 - 19:29 UnknownUser Stave and module
PowerPointppt P.Sutcliffe_SLHC_engineering_9th_May_2007.ppt r1 manage 884.5 K 2007-05-08 - 17:39 UnknownUser Double sided module concepts
PowerPointppt Peter_Sutcliffe_8th_Oct_oxford.ppt r1 manage 1718.0 K 2007-10-08 - 13:12 UnknownUser Peter Sutcliffe's talk
PowerPointppt Pipe_diameters.ppt r1 manage 142.5 K 2007-05-10 - 17:56 UnknownUser Calculations on pipe diameters
PowerPointppt Planned_Oxford_activities.ppt r1 manage 42.0 K 2007-06-21 - 22:52 UnknownUser  
PowerPointppt RAL_WP7June22.ppt r1 manage 43.5 K 2007-06-21 - 14:58 JustinGreenhalgh RAL's engineering interests
Microsoft Word filedoc Revised_Minutes_of_WP7_Meeting_27th_July.doc r1 manage 37.5 K 2007-10-08 - 09:46 RichardNickerson Minutes of previous meeting
PDFpdf SLHC-liverpool_FEA.pdf r1 manage 335.8 K 2007-05-08 - 17:21 UnknownUser FEA on module
PDFpdf SLHCHYB1.pdf r1 manage 175.0 K 2007-03-28 - 16:30 UnknownUser conceptual hybrid
PDFpdf SLHC_Hybrid_Services.pdf r2 r1 manage 107.4 K 2007-05-08 - 17:31 UnknownUser Updated hybrid service concept
PowerPointppt SLHC_Module_Requirements.ppt r2 r1 manage 255.0 K 2007-10-08 - 13:01 UnknownUser New version of Phil's MIWG Summary with Mike's presentation at the end
PowerPointppt SLHC_Modules.ppt r1 manage 2391.5 K 2007-06-28 - 13:01 RichardNickerson Jones Module talk for 2nd
PowerPointppt SLHC_Stavel_design_concepts_2.ppt r1 manage 2355.0 K 2007-05-07 - 16:57 UnknownUser Minium Change Design Update
PowerPointppt SLHC_Stavel_design_concepts_3.ppt r1 manage 7176.5 K 2007-05-07 - 17:03 UnknownUser Update on Outer Shell concept
PowerPointppt SLHC_Stavel_design_concepts_4.ppt r1 manage 12913.5 K 2007-06-22 - 13:00 UnknownUser wing2
PowerPointppt SLHC_Stavel_design_concepts_6.ppt r1 manage 14801.5 K 2007-07-27 - 09:26 RichardNickerson Supermodule Design Concepts - Wing
PDFpdf SLHC_Stavel_design_concepts_7.pdf r1 manage 4339.1 K 2007-10-08 - 12:53 UnknownUser Wing Laus's talk
PowerPointppt SLHC__mar09.ppt r1 manage 44212.5 K 2007-05-09 - 12:34 UnknownUser  
PowerPointppt SLHC_barrel_design_FEA.ppt r1 manage 238.5 K 2007-03-28 - 12:05 UnknownUser fea cooling pipe
PDFpdf SLHC_barrel_design_concepts_3.pdf r1 manage 1378.5 K 2007-03-27 - 10:05 UnknownUser Support cylinder concepts
PDFpdf SLHC_barrel_design_concepts_4.pdf r1 manage 276.6 K 2007-03-27 - 10:06 UnknownUser Segmented Cylinder Local Support 1
PowerPointppt SLHC_barrel_design_concepts_4.ppt r1 manage 2515.5 K 2007-06-22 - 12:57 UnknownUser wing
Microsoft Excel Spreadsheetxls Services.xls r1 manage 22.0 K 2007-05-23 - 17:40 UnknownUser List of services on supermodule
PowerPointppt Tapes.ppt r1 manage 158.0 K 2007-07-27 - 09:30 RichardNickerson Service Tape - Georg
PowerPointppt Tapes_etc.ppt r1 manage 34.0 K 2007-05-09 - 11:47 UnknownUser Some thoughts on tapes and connectors
PowerPointppt Tim_UC031207L.ppt r1 manage 4816.0 K 2007-12-03 - 11:31 RichardNickerson Tims Talk
PowerPointppt WP722-7.ppt r1 manage 527.0 K 2007-06-21 - 18:19 RichardNickerson Andy - cooling progress
PDFpdf WP7_03DEC07_QMUL-GAB_.pdf r1 manage 405.2 K 2007-12-02 - 14:53 UnknownUser G.Beck Update on thermal performance
Microsoft Word filedoc WP7_22-6-07_QMUL-GAB_.doc r1 manage 627.5 K 2007-06-21 - 16:38 UnknownUser G.Beck Spreader and MCMD calculations
Microsoft Excel Spreadsheetxls WP7_Costs.xls r1 manage 28.0 K 2008-02-18 - 09:54 RichardNickerson Updated Cost Profiles for WP7
Microsoft Excel Spreadsheetxls WP7_Costs_v2.xls r1 manage 28.0 K 2008-02-18 - 11:54 RichardNickerson WP7 Costs Reprofile v2.0
Microsoft Excel Spreadsheetxls WP7_Costs_v3.xls r1 manage 33.0 K 2008-02-25 - 09:34 RichardNickerson Costs version 3.0
PowerPointppt WP7barrelend1007.ppt r1 manage 1130.0 K 2007-10-05 - 15:03 RichardNickerson Janet Fraser
PowerPointppt WigglesOxfordOct.ppt r1 manage 4515.0 K 2007-10-08 - 12:18 UnknownUser Talk by Tim Jones
PowerPointppt endbarrel31207a.ppt r1 manage 1185.0 K 2007-12-03 - 00:49 RichardNickerson Janet end of barrel region
PowerPointppt engineering_22nd_June2007.ppt r2 r1 manage 4367.0 K 2007-07-27 - 09:21 RichardNickerson Supermodule Design 27th July Wing
PowerPointppt fixed_brackets_-_concept.ppt r1 manage 21.0 K 2007-03-28 - 16:12 UnknownUser fixed bracket concept
PowerPointppt for-July-meeting.ppt r1 manage 2304.0 K 2007-06-28 - 10:12 AnthonyAffolder Slides from Gianluigi for sensor meeting
PDFpdf look_alike.pdf r1 manage 27.6 K 2007-03-21 - 15:51 UnknownUser Existing Barrel Look-Alike Two-pipe Local Support
PowerPointppt look_alike.ppt r1 manage 149.5 K 2007-03-21 - 10:47 UnknownUser Existing Barrel Look-Alike Two-pipe Local Support
PowerPointppt outer_shell.ppt r1 manage 67.0 K 2007-04-02 - 14:10 UnknownUser Supermodule concept with symmetric modules using an outer CF shell to achieve required stiffness
PowerPointppt raleng27-7-07.ppt r1 manage 61.5 K 2007-07-27 - 09:27 RichardNickerson RAL summary - Andy
PowerPointppt slhcbarrelend.ppt r1 manage 227.0 K 2007-05-07 - 16:55 UnknownUser Barrel End
Microsoft Excel Spreadsheetxls tubesize.xls r1 manage 26.0 K 2007-05-17 - 12:50 UnknownUser Calculations of tube wall thickness for various diameters and materials by Andy Nichols
PowerPointppt upgradedecide.ppt r2 r1 manage 52.0 K 2007-07-27 - 09:33 RichardNickerson Endbarrel - Janet
PowerPointppt wp_meeting_RBN_v3.ppt r1 manage 5214.0 K 2008-02-25 - 11:48 RichardNickerson WP Meeting v3
Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2020-08-20 - TWikiAdminUser
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Sandbox/SandboxArchive All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright &© 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback