TODOs

  • bgvdata package (pytimber, XRootD)
  • WinCC - SiPMs current & temperatures
  • Contacts
    • [Didier] : Gas pressure operation issues & information
    • [Colin] : Resetting of tunnels after restart of bgvgw machine
    • [Colin] : Resetting of time sync after restart of bgvopc machine
  • Critical: Finish CryoBLM analysis notebook.

[2016-08-15]

  • BGV TELL1 ccserv communication error solution found, check BGV Troubleshooting
  • CryoBLM - VS progress, cleaning of data, notebook script for display of VS

[2016-08-17]

  • Big CryoBLM progress
    • QMBox VS done
    • QMBox multiple bias degradation curves done - still need cleaning
    • BLEDP sum data extracted - not corrected form.
  • Tried to have something based on the OfflinePlotter for the BGV
    • Failed - problems running the new Gaudi job I am preparing.

[2016-08-18] Laussane

  • SiPM station 1 channel 1 (R side of module 10-4L)
    • High current because of not so well matched SiPMs - bug while tested - OK
    • OK to increase threshold to 3mA - Done.
  • Discussions on tracking - more to come.

Friday Recap

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r2 - 2016-08-19 - AndreasAlexopoulos
 
    • Cern Search Icon Cern Search
    • TWiki Search Icon TWiki Search
    • Google Search Icon Google Search

    Sandbox All webs login

This site is powered by the TWiki collaboration platform Powered by PerlCopyright & 2008-2020 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
or Ideas, requests, problems regarding TWiki? use Discourse or Send feedback