TOTEM shifter instruction
DAQ
To start a run with “The vFAT Duck”:
- Press “Start processes”
- Press “Start”
To stop a run with “The vFAT Duck”:
When to start a new run:
- If run crashes. In that case, click "Halt" in LTC Control page before starting a new run.
- If CMS stops the run
- When beam ramp starts: One should stop run, run ./96p_120Pb.sh in ~/VME/run_scripts/new_firmware/ before starting the new run
If XDAQ online web-page is not running
How to include RP into the DAQ configuration
- Make sure that the DAQ is stopped.
- Go to the Connected Run Parameters by pressing its < button
- Go to the Disconnected Configuration by pressing its < button
- Press its Define button, and select ‘load’
- Select from the list of possible configurations the T2+RP+Trigger, and press OK. Press OK again, but beware that this pain appears in the lower monitor!
- Press the > button of the Disconnected Configuration
- Press the > button of the Connected Run Parameters
- Go to the LCT Control windows and select by a checkmark the sTTS(3). Until starting the run this might look in busy state, and press Apply
How to remove RP from the DAQ configuration
- Make sure that the DAQ is stopped.
- Go to the Connected Run Parameters by pressing its < button
- Go to the Disconnected Configuration by pressing its < button
- Press its Define button, and select ‘load’
- Select from the list of possible configurations the T2+Trigger, and press OK. Press OK again, but beware that this pain appears in the lower monitor!
- Press the > button of the Disconnected Configuration
- Press the > button of the Connected Run Parameters
- Go to the LCT Control windows and remove the checkmark from the sTTS(3). and press Apply
Runlog
Make a new entry for each run in
https://totem-runlog.web.cern.ch/totem-runlog/fcgi/runs/new/
Where to find the information to fill in:
DCS
To start DCS:
- ssh –X nturini@cmsusr0
- (ask password from experts)
- cd .rdesktop
- rm (the only file in the directory)
- rdesktop –u username –d CERN cerntscms –g1920x1080
- give your password
- click TOTEM DCS (TOTEM User Interface Window)
Monitor DCS for T2 voltages and current
- Go to T2 page by clicking the box next to word T2.
- If something is red, call Nicola (160907)
Check that TOTEM status flag is correct
- Go to LHC page by clicking the box next to word LHC
- Check TOTEM Status in Handshake box.
- If not correct, change it by selecting the right one from the drop-down menu
- Correct status flags:
- Physics: data taking with stable beams
- Standby: outside of stable beams
- Calibration: test runs, e.g. latency scans
Trigger rate scripts
Graphical view of trigger logic:
T2_CMS_Triggers.pdf
Output from new_trigger_scalers_CMS.sh:
- Trigger paths separated by #:
- Columns for each trigger path:
- Raw trigger rate
- Trigger rate after the fork (fork = pre-selection of bunches that trigger)
- Pre-scaled trigger rate after the fork
- Trigger paths from left to right:
- RP vertical 220
- RP horizontal 220
- CMS L1
- L1SA
- T2 minbias
- T2 low multiplicity
- CMS L1
- TOTEM L1
Output from CMSPath_scalers.sh:
- Rates that TOTEM sends to CMS
- Trigger paths separated by #:
- Columns for each trigger path:
- Raw trigger rate
- Trigger rate after the fork (fork = pre-selection of bunches that trigger)
- Pre-scaled trigger rate after the fork
- Trigger paths from left to right:
- RP vertical 220
- RP horizontal 220
- Bunch crossing
- T2 SD
- T2 min bias
- T2 low multiplicity
- L1 to CMS
Orbit synchronization
Check LTC Control for orbin sync
- Go to LTC Control page
- Check “Orbit in sync.?”
- If “no”
- Go to Main Config –tab
- Select “Reset” (under QPLLCTRL B it 5 (ignored if not external):
- Click “Apply”
- Select “No Reset”
- Click “Apply”
Contact numbers
- TOTEM shifter: 16 2476
- DAQ: 16 1531
- T2: 16 2474
- T2 GEM Eraldo: 16 6126
- DCS:
- Ivan: 16 8864
- Sascha: 16 3680
- Trigger Nicola: 16 0907
- Complaints, worries, organisation: Mario 16 3762